Installing the differential monitoring system for fuel consumption on 2 main engines with displaying the data on the operator’s console in the central control room. Installing the monitoring repeater interfaced with a GPS-module on the bridge. Displaying the CSV-format data on the ship’s computer.
For the first months of operation, this system helped to improve the work of two engines. Since there were large discrepancies in the fuel consumption of the Main engine No. 1 and engine No. 2
SHIPOWNER/ CUSTOMER
AB DFDS Seaways, Klaipeda, Lithuania
PLACE OF IMPLEMENTATION/ EXECUTION TIME
Paldiski Port, Estonia
12.2013 – 02.2014