
Similar Posts

Tanker «Ugo Ocha»
At the request of the client, a fuel consumption metering system was installed for ship boilers and diesel generators. 2 boilers and 3 diesel generators. The system is assembled on the basis of Coriolis type…

Cruise ferry «BALTIC QUEEN»
Installation Engine group measurement with volume-type flowmetering system (group of Main Engines and group of Auxiliary engines). Connection to the FCM system Anemometer and Inclinometer. Installation of two torque-meters on propeller shafts.Mass acceleration flowmeter for…

Cargo and Passenger Ferry «REGAL STAR»
Installing the differential monitoring system for fuel consumption on 2 main engines. Implementing the linear measuring system on 6 diesel-generators and a boiler. Displaying the data on the operator’s console in the central control room….

Tug “Nibulon”
Task: Automation of control of ship mechanisms Solution: – Supply of a centralized control system – Management and emergency alarms – 3pcs – Start-module. Output of information to adjustment work on the system centralized control…

Chemical tanker “Sichem Mumbai”
Task: Control over fuel consumption for the Main Engine. Installation of a fuel additive dosing system. Problem identified: Non-transparent reporting system for fuel consumption Solution: Installation of a differential fuel consumption control system on the…

Fishing vessel «ATLANTIC HERMES»
The specification has been developed and the design has been carried out fully for a system of differential fuel consumption control on 2x Main engines, 2 diesel generators and a boiler. Installation of the torsiometer…