Cruise ferry «ROMANTIKA»
I-stage: Installing the differential monitoring system for fuel consumption on 4 main engines, 3 auxiliary engines and 2 boilers. Monitoring of the fuel rate transferred from the fuel storage tanks. Installing the fuel additive metering system depending on fuel consumption of the main engine. Displaying the data on the operator’s console in the central control …