Bulk Carrier «VOYAGEUR»

Installing the differential monitoring system for fuel consumption on the main engine and 3 diesel-generators. Displaying the data on the operator’s console in the central control room. Transmitting the CSV-format data to the ship’s network. Thanks to the system, the crew, the office and the ship’s operator received a complete overview of the reporting on …

Cargo and Passenger Ferry «REGAL STAR»

Installing the differential monitoring system for fuel consumption on 2 main engines. Implementing the linear measuring system on 6 diesel-generators and a boiler. Displaying the data on the operator’s console in the central control room. Installing the monitoring repeater interfaced with GPS- module in the bridge. Installing 2 viscous meters. Installing 2 torsionmeters on propeller …

Icebreaker «BOTNIKA»

Monitoring the bunkering line and fuelling on board the ship, displaying data on LCD panels in the engine boiler room. Bunkering system helped the ship’s crew to challenge a lack of 19 tons of fuel after bunkering, which took place on the territory of Canada. SHIPOWNER/ CUSTOMER Tallinn Port, Tallinn PLACE OF IMPLEMENTATION/ EXECUTION TIME …

Fishing vessel «NESSIE»

An automation and control system has been installed: – Main engine control – Control of trawl winches, as well as the length of the etched cable – Navigation lights control The system helped the crew to automate the control of the ship’s mechanisms. SHIPOWNER/ CUSTOMER Troolari Nessie Oy Finland PLACE OF IMPLEMENTATION/ EXECUTION TIME Finland …

Hydrographic vessel “Albatross”

Solution: Manufacturing and supply of propeller shaft tachometer “TA-12M” consisting of: -Local indication device (PDI) – 2 pcs. Production and delivery of the panel of signal and distinctive lights “SKILINE-M” for 16 lights, with power backup, consisting of: – Power supply and switching unit – 1 piece – Control panel – 1 piece Manufacturing and …

Fishing vessel “SONNE”

A task: Mechanism control automation Solution: Installed automation and control system: – Main engine control – Control of trawl winches, as well as the length of the etched cable – Navigation lights control – APS system – Measurements of levels in tanks with information output to a multifunctional operator panel 15 inches Result: The work …

Ferry “Wrango”

A task: Mechanism control automation Solution: Our new automation system has been installed: – APS system – Measurements of levels in ballast and other tanks with information output to the operator panel – Installation of navigation lights – Control of ballast drives Result: The goal has been achieved. The work of controlling the mechanisms of …

Chemical tanker “Sichem Mumbai”

Task: Control over fuel consumption for the Main Engine. Installation of a fuel additive dosing system. Problem identified: Non-transparent reporting system for fuel consumption Solution: Installation of a differential fuel consumption control system on the main engine. A fuel additive supply system has been developed and implemented, taking into account the instant fuel consumption. Result: …

Cargo-passenger ferry “STAR”

Task: Control and automated accounting of fuel consumption at 4 main engines, 3 diesel generators, 2 boilers. Accounting and control of the consumption of ship energy. Monitoring of bunkering (receiving fuel on the ship). Problem: Increased fuel consumption. Solution: Installation of a differential fuel consumption control system for 4 main, 3 auxiliary engines and 2 …

Passenger and freight ferry “Patria Seaways”

Installing the differential monitoring system for fuel consumption on 2 main engines with displaying the data on the operator’s console in the central control room. Installing the monitoring repeater interfaced with a GPS-module on the bridge. Displaying the CSV-format data on the ship’s computer. For the first months of operation, this system helped to improve …