A task:Setting fuel level monitoring Solution:The specification was developed and the design was completed in full for the fuel consumption control system for the main engine and a group of diesel generators.Installation of differential measurement on the boiler.Torsiometer installation on the shaft with connection to the system.Connecting Anemometer and Inclinometer to FCM system.Information output to …

Cargo-passenger ferry SUPERSTAR

A task: Solution: Installation of a fuel consumption control system on fuel preparation modules of 4 main engines, 3 diesel generators and 2 boilers. Installation of toriometers on propeller shafts – 2 pcs, information output to the operator panel in the CPU / control repeater on the bridge coupled with a GPS module, installation of …

Bulk carrier “Portage”

Objective: To establish control over fuel consumption. Solution: Installation of a differential system on the main engine and 3 diesel generators. Information output to the operator panel in the CPU. Output of information to the general ship network in CSV format. Result: Thanks to the system, the crew, office and operator of the vessel received …

Hydrographic vessel “Albatross”

Solution: Manufacturing and supply of propeller shaft tachometer “TA-12M” consisting of: -Local indication device (PDI) – 2 pcs. Production and delivery of the panel of signal and distinctive lights “SKILINE-M” for 16 lights, with power backup, consisting of: – Power supply and switching unit – 1 piece – Control panel – 1 piece Manufacturing and …

Tug “Nibulon”

Task: Automation of control of ship mechanisms Solution: – Supply of a centralized control system – Management and emergency alarms – 3pcs – Start-module. Output of information to adjustment work on the system centralized control Result; The system helped the crew to automate the control of the ship’s mechanisms

Fishing vessel “SONNE”

A task: Mechanism control automation Solution: Installed automation and control system: – Main engine control – Control of trawl winches, as well as the length of the etched cable – Navigation lights control – APS system – Measurements of levels in tanks with information output to a multifunctional operator panel 15 inches Result: The work …

Ferry “Wrango”

A task: Mechanism control automation Solution: Our new automation system has been installed: – APS system – Measurements of levels in ballast and other tanks with information output to the operator panel – Installation of navigation lights – Control of ballast drives Result: The goal has been achieved. The work of controlling the mechanisms of …

Bulk carrier “Atlantic Bridge”

Task: Control over fuel consumption for the Main Engine and 3 diesel generators Problem: lack of an automated reporting and cost accounting system. Solution: Installation of a differential system on the main engine and 3 diesel generators. Output of information to the operator panel 10 inches in the CPU. Output of information to the general …

Chemical tanker “Sichem Mumbai”

Task: Control over fuel consumption for the Main Engine. Installation of a fuel additive dosing system. Problem identified: Non-transparent reporting system for fuel consumption Solution: Installation of a differential fuel consumption control system on the main engine. A fuel additive supply system has been developed and implemented, taking into account the instant fuel consumption. Result: …